Detour
Chippewa County, Michigan · EIA plant ID 6369 · Operator: Cloverland Electric Co-op
Nameplate6MWSummer 5 MW
Generators2in service
Net generation2GWh12 mo to Dec 2025
Capacity factor4%gas/coal/oil units, summer MW
Heat rate13,558Btu/kWhfossil units, electric fuel, HHV
First online1973Runs as peaking
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 0 | 0.1% | 24,143 |
| 2002 | 0 | 0.0% | — |
| 2003 | 1.1 | 2.6% | 10,530 |
| 2004 | -0.2 | -0.5% | — |
| 2005 | 0.4 | 0.8% | 19,396 |
| 2006 | 0 | 0.1% | — |
| 2007 | 0.5 | 1.2% | 16,252 |
| 2008 | 0.9 | 2.0% | 15,645 |
| 2009 | 2.2 | 5.0% | 13,048 |
| 2010 | 0.8 | 1.7% | 15,613 |
| 2011 | 0.7 | 1.7% | 15,884 |
| 2012 | 0.7 | 1.7% | 14,937 |
| 2013 | 0.5 | 1.1% | 17,624 |
| 2014 | 0.3 | 0.8% | 15,612 |
| 2015 | 0 | 0.0% | — |
| 2016 | 0 | 0.0% | — |
| 2017 | 0 | 0.0% | — |
| 2018 | -0.1 | -0.2% | — |
| 2019 | 0.4 | 0.9% | 19,588 |
| 2020 | 0.2 | 0.4% | 29,468 |
| 2021 | 0.8 | 1.9% | 13,794 |
| 2022 | 0.6 | 1.4% | 9,671 |
| 2023 | 0.6 | 1.4% | 14,390 |
| 2024 | 1.5 | 3.4% | 12,434 |
| 2025 | 1.8 | 4.2% | 13,558 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 6 | Petroleum Liquids | IC | 3 | 2.5 | Oct 1973 | Operating | — | coming soon |
| 7 | Petroleum Liquids | IC | 3 | 2.5 | Aug 1976 | Operating | — | coming soon |
Owner / operator
Operator: Cloverland Electric Co-op. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Cloverland Electric Co-op | 100.0% | 6 MW |
Nearby plants
Within 80 km.
| Pickford Solar | 7 MW | 40.8 km |
| Dafter | 11 MW | 58.5 km |
| Cheboygan | 2 MW | 58.8 km |
| Alverno Hydro Plant | 1 MW | 61.1 km |
| Edison Sault | 42 MW | 65.8 km |
| Saint Marys Falls | 24 MW | 67.3 km |