Primient Loudon Plant
Loudon County, Tennessee · EIA plant ID 63632 · Operator: Tate and Lyle Ingredients, LLC
Nameplate61MWSummer 52 MW
Generators2in service
Net generation366GWh12 mo to Dec 2025
Capacity factor80%gas/coal/oil units, summer MW
Heat rate11,325Btu/kWhfossil units, electric fuel, HHV
First online2016Runs as baseload
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2019 | 404.3 | 88.8% | 11,395 |
| 2020 | 329 | 72.0% | 11,264 |
| 2021 | 346.2 | 76.0% | 11,398 |
| 2022 | 387 | 85.0% | 11,398 |
| 2023 | 402.4 | 88.3% | 11,337 |
| 2024 | 393.6 | 86.2% | 11,397 |
| 2025 | 366.4 | 80.4% | 11,325 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| Y9111 | Natural Gas Fired Combustion Turbine | GT | 30.7 | 26 | Oct 2016 | Operating | — | coming soon |
| Y9121 | Natural Gas Fired Combustion Turbine | GT | 30.7 | 26 | Oct 2016 | Operating | — | coming soon |
Owner / operator
Operator: Tate and Lyle Ingredients, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Tate and Lyle Ingredients, LLC | 100.0% | 61 MW |
Nearby plants
Within 80 km.
| Fort Loudoun | 153 MW | 9.3 km |
| Vonore Battery Energy Storage System | — | 13.9 km |
| Melton Hill | 72 MW | 16.8 km |
| Kingston | 1,700 MW | 25.7 km |
| SR Maryville | 1 MW | 27.5 km |
| SR Blount, LLC | 2 MW | 28.7 km |