Extreme Via Del OroRetired

Santa Clara County, California · EIA plant ID 63607 · Operator: Bloom Energy
Natural gasCAISOBA: CISO

×1 MW natural gas retired since 2020 (latest Mar 2024)

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—Btu/kWhfossil units, electric fuel, HHV
First online—

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.51GWh20202021202220232024

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%50%100%2019202020212022202320242025

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
6,0006,5007,0002019202020212022202320242025
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2019890.3%6,390
202010.599.8%6,712
20219.792.2%7,062
20228.277.7%7,199
20238.580.5%6,764
20241.589.5%6,473

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
EXN01Other Natural GasFC1.21.2Mar 2019Retired Mar 2024—coming soon

Owner / operator

Operator: Bloom Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Extreme San Ignacioretired0.1 km
Equinix Great Oaks Blvd. Fuel Cell5 MW0.4 km
EQX010 Great Oaks Fuel Cell2 MW0.5 km
Equinix San Jose1 MW0.5 km
EQX015 Great Oaks Fuel Cell4 MW0.5 km
Hummingbird Energy Storage LLC75 MW0.5 km