← Back to map

Westminister NCPlanned

Rutherford County, North Carolina · EIA plant ID 63567 · Operator: Ecoplexus, Inc
SolarBA: DUK

60 MW planned (Solar Photovoltaic), first expected Dec 2028 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
WSMTRSolar PhotovoltaicPV6060planned Dec 2028Planned—coming soon

Owner / operator

Operator: Ecoplexus, Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Lincoln Solar, LLC (NC)5 MW12.2 km
Bostic Delivery No 21 MW12.6 km
Innovative Solar 18, LLC2 MW13.9 km
Gamble Solar3 MW14.8 km
Amethyst Solar3 MW15 km
Clear Solar I, LLC4 MW17.4 km