← Back to map

Montclair State University Cogen

Passaic County, New Jersey · EIA plant ID 63501 · Operator: Cartier Energy, LLC
Natural gasNatural Gas Fired Combustion TurbineNatural Gas Internal Combustion Engine⛽ Dual-fuelPJMBA: PJM
Nameplate12MWSummer 11 MW
Generators3in service
Net generation47GWh12 mo to Dec 2025
Capacity factor50%gas/coal/oil units, summer MW
Heat rate11,502Btu/kWhfossil units, electric fuel, HHV
First online2013Runs as baseload

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0246GWh2019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2019202020212022202320242025202649.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
8,00010,00012,0002019202020212022202320242025202611,502 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20191.92.0%11,373
20202.52.7%9,501
20212.22.3%9,391
202243.245.7%12,929
20234749.7%11,387
202447.550.1%11,476
202547.149.8%11,502

Fuel capability

Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusLikely still dual fuel
Liquid fuel burned · 36 mo18,396 MMBtu
Last month with liquid burnDec 2025
Switch while operatingYes
Net summer MW on gas5
Net summer MW on oil5
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 1 h (EIA 1H)

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CTG-1Natural Gas Fired Combustion TurbineGT6.45.4Sep 2013Operating—coming soon
ENG-1Natural Gas Internal Combustion EngineIC2.72.7Jun 2018Operating—coming soon
ENG-2Natural Gas Internal Combustion EngineIC2.72.7Jun 2018Operating—coming soon

Owner / operator

Operator: Cartier Energy, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Cartier Energy, LLC100.0%12 MW

Nearby plants

Within 80 km.
Passaic Valley Water Commission2 MW3.5 km
Hoffmann LaRoche11 MW4.8 km
St.Joseph's Regional Medical Center6 MW4.9 km
St. Josephs Paterson3 MW5.1 km
Great Falls Hydro Project12 MW5.7 km
Harmon DC Totowa NJ2 MW6.1 km