Maverick Wind Project, LLC
Major County, Oklahoma · EIA plant ID 63494 · Operator: Public Service Co of Oklahoma
Nameplate288MWSummer 288 MW
Generators1in service
Net generation971GWh12 mo to Aug 2026
Capacity factor38%wind units, summer MW
Heat rate—thermal plants only
First online2021
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2021 | 192 | 22.8% | — |
| 2022 | 939 | 37.2% | — |
| 2023 | 912.1 | 36.1% | — |
| 2024 | 896.3 | 35.4% | — |
| 2025 | 855.5 | 33.9% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| GEN1 | Onshore Wind Turbine | WT | 288 | 288 | Sep 2021 | Operating | — | ge 2.82-127 |
Owner / operator
Operator: Public Service Co of Oklahoma. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Southwestern Electric Power Co | 54.4% | 157 MW |
| Public Service Co of Oklahoma | 45.6% | 131 MW |
Nearby plants
Within 80 km.
| Skeleton Creek Energy Center Hybrid | 752 MW | 27.9 km |
| Red Dirt Wind Project | 299 MW | 39.2 km |
| Breckinridge Energy Storage | 65 MW | 45.4 km |
| Breckinridge Wind Project LLC | 99 MW | 47.5 km |
| Covington Solar Farm | 10 MW | 51.9 km |
| Kingfisher | 9 MW | 53 km |