Sterling County, Texas · EIA plant ID 63351 · Operator: Bluebell Solar II, LLC
SolarSolar PhotovoltaicERCOTBA: ERCO
Nameplate115MWSummer 115 MW
Generators1in service
Net generation256GWh12 mo to Aug 2026
Capacity factor25%solar units, summer MW
Heat rate—thermal plants only
First online2020

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
010203040GWh202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2020202120222023202420252026202725.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202021.525.1%—
2021281.227.9%—
2022274.827.3%—
2023286.728.5%—
2024266.126.3%—
2025254.525.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BBS2Solar PhotovoltaicPV115115Dec 2020Operating—coming soon

Owner / operator

Operator: Bluebell Solar II, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Bluebell Solar II, LLC100.0%115 MW

Nearby plants

Within 80 km.
Bluebell Solar30 MW2 km
Coke BESS—6.4 km
Goat Wind LP150 MW7.8 km
Aviator Wind525 MW16.1 km
Jameson Gas Processing Plant2 MW22 km