OE_AZ1

La Paz County, Arizona · EIA plant ID 63349 · Operator: Novatus Energy
SolarSolar PhotovoltaicBA: WALC
Nameplate33MWSummer 33 MW
Generators1in service
Net generation77GWh12 mo to Aug 2026
Capacity factor27%solar units, summer MW
Heat rate—thermal plants only
First online2020

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02.557.510GWh2020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2020202120222023202420252026202727.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20190.7——
202082.528.9%—
202187.830.8%—
202278.127.4%—
202381.928.8%—
202486.530.3%—
202580.528.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
AZ1Solar PhotovoltaicPV32.532.5Jan 2020Operating—coming soon

Owner / operator

Operator: Novatus Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Novatus Energy100.0%33 MW

Nearby plants

Within 80 km.
Atlas—22.4 km
Atlas VIII—22.8 km
ATLAS II—22.8 km
Atlas BESS IV LLC—22.8 km
ATLAS SOLAR IV—22.8 km
Atlas VII300 MW22.8 km