← Back to map

Aragorn Solar Project

Culberson County, Texas · EIA plant ID 63329 · Operator: SE Aragorn, LLC
SolarSolar PhotovoltaicERCOTBA: ERCO
Nameplate187MWSummer 180 MW
Generators1in service
Net generation349GWh12 mo to Aug 2026
Capacity factor22%solar units, summer MW
Heat rate—thermal plants only
First online2021

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02040GWh20222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202120222023202420252026202722.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20213022.4%—
2022405.325.7%—
2023427.327.1%—
2024344.321.8%—
202535822.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
IPAGNSolar PhotovoltaicPV187.2180Dec 2021Operating—coming soon

Owner / operator

Operator: SE Aragorn, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
SE Aragorn, LLC100.0%187 MW

Nearby plants

Within 80 km.
Titan Solar Project260 MW2.6 km
AETS Old Michigan Solar LLC10 MW24.9 km
Wallace Solar - (TX)—25.1 km
Hayhurst Texas Solar25 MW35.4 km
Screwbean10 MW39.2 km
Hayhurst New Mexico Solar20 MW47.1 km