← Back to map

Mtn. Solar 2

Adams County, Colorado · EIA plant ID 63277 · Operator: Standard Solar
SolarSolar PhotovoltaicBA: PSCO
Nameplate2MWSummer 2 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor27%solar units, summer MW
Heat rate—thermal plants only
First online2019

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300400MWh202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2019202020212022202320242025202627.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2019122.7%—
20203.727.7%—
20213.526.9%—
20223.325.1%—
20233.526.7%—
20243.727.9%—
20253.627.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
X0133Solar PhotovoltaicPV1.51.5Sep 2019Operating—coming soon

Owner / operator

Operator: Standard Solar. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Standard Solar100.0%2 MW

Nearby plants

Within 80 km.
Xcel Adams 1 Community Solar Array2 MW0.2 km
Mtn. Solar 12 MW1.3 km
Oak Leaf - CSG Portfolio (OL 44)2 MW1.9 km
Oak Leaf - CSG Portfolio (OL 37)2 MW2.1 km
Oak Leaf - CSG Portfolio (OL 38)2 MW2.1 km
CO LI CSG 1 - Kamerra2 MW2.1 km