← Back to map

AC Power

Burlington County, New Jersey · EIA plant ID 63260 · Operator: Altus Power America Management, LLC
SolarSolar PhotovoltaicPJMBA: PJM
Nameplate1MWSummer 1 MW
Generators1in service
Net generation2GWh12 mo to Dec 2025
Capacity factor18%solar units, summer MW
Heat rate—thermal plants only
First online2019

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200MWh202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2019202020212022202320242025202618.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20190.915.7%—
20202.118.2%—
20212.118.6%—
20222.319.8%—
20232.218.9%—
20242.218.8%—
20252.118.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
ACPSolar PhotovoltaicPV1.31.3Jul 2019Operating—coming soon

Owner / operator

Operator: Altus Power America Management, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Altus Power America Management, LLC100.0%1 MW

Nearby plants

Within 80 km.
Delanco2 MW0 km
Campus Drive Solar4 MW4.7 km
Jefferson Torresdale Hospital1 MW4.7 km
Croydon CT Generating Station546 MW5 km
Cinnaminson Landfill Solar10 MW5.6 km
PSEG Burlington Generating Station242 MW5.6 km