Triple H Wind Project

Hyde County, South Dakota · EIA plant ID 63103 · Operator: Engie North America
WindOnshore Wind TurbineSPPBA: SWPP
Nameplate250MWSummer 250 MW
Generators1in service
Net generation862GWh12 mo to Aug 2026
Capacity factor39%wind units, summer MW
Heat rate—thermal plants only
First online2020

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0255075100GWh202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2020202120222023202420252026202739.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2020119.232.5%—
20211,02846.9%—
20221,018.746.5%—
2023918.441.9%—
2024968.344.1%—
20251,030.947.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
WTGOnshore Wind TurbineWT250.2250.2Nov 2020Operating—ge 2.7-116

Owner / operator

Operator: Engie North America. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Triple H Wind Project, LLC100.0%250 MW

Nearby plants

Within 80 km.
North Bend Wind Project, LLC200 MW5.2 km
South Dakota Wind Energy Cente41 MW18.4 km
Rolling Thunder Wind Farm Hybrid26 MW38.3 km
Big Bend Dam538 MW42.2 km
Pierre Solar1 MW55.9 km
Ft. Pierre6 MW61.9 km