← Back to map

White CSG

Baltimore County, Maryland · EIA plant ID 63085 · Operator: Nautilus Solar Solutions
SolarSolar PhotovoltaicPJMBA: PJM
Nameplate2MWSummer 2 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor16%solar units, summer MW
Heat rate—thermal plants only
First online2020

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300MWh2019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%202020212022202320242025202616.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20190——
20202.916.4%—
20213.117.8%—
20223.318.8%—
20233.117.7%—
2024316.8%—
20252.916.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
15124Solar PhotovoltaicPV22Jan 2020Operating—coming soon

Owner / operator

Operator: Nautilus Solar Solutions. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nautilus Solar Solutions100.0%2 MW

Nearby plants

Within 80 km.
THD Baltimore DCs - 5829 Project Lion4 MW1.8 km
THD Baltimore DC - 5830 Project Tiger2 MW2 km
Amazon Maryland DCA11 MW2.1 km
Herbert A Wagner774 MW5 km
Brandon Shores1,370 MW5.1 km
Marley Neck 3 - SLBAL005—6.3 km