Tip Top Solar Energy Center LLCUnder construction
Lea County, New Mexico · EIA plant ID 63028 · Operator: Invenergy Services LLC
220 MW under construction (Solar Photovoltaic), first expected Dec 2026 · EIA-860M
Nameplate—MWSummer — MW
Generators0in service · 220 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| GEN1 | Solar Photovoltaic | PV | 220 | 220 | planned Dec 2026 | Under construction | — | coming soon |
Owner / operator
Operator: Invenergy Services LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| SPS2 Jal | 10 MW | 14.4 km |
| SPS1 Dollarhide | 10 MW | 17.5 km |
| WT2 | — | 33.1 km |
| SPS3 Lea | 10 MW | 37.4 km |
| Grey Wolf | — | 40.7 km |
| Alira | — | 41.1 km |