Fighting Jays Solar Project
Fort Bend County, Texas · EIA plant ID 62945 · Operator: AP Solar 2, LLC
Nameplate228MWSummer 228 MW
Generators1in service
Net generation510GWh12 mo to Aug 2026
Capacity factor26%solar units, summer MW
Heat rate—thermal plants only
First online2022
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2022 | 250.3 | 21.4% | — |
| 2023 | 491.7 | 24.7% | — |
| 2024 | 283.8 | 14.2% | — |
| 2025 | 454.2 | 22.8% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| FJSOL | Solar Photovoltaic | PV | 227.5 | 227.5 | Jun 2022 | Operating | — | coming soon |
Owner / operator
Operator: AP Solar 2, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| AP Solar 2, LLC | 100.0% | 228 MW |
Nearby plants
Within 80 km.
| Rock Rose Energy Storage LLC | — | 4.2 km |
| Cutlass Solar II | 203 MW | 4.8 km |
| Cutlass Solar 1 LLC | 111 MW | 5.8 km |
| Old 300 Storage Center | 250 MW | 7.3 km |
| Old 300 Solar Center, LLC | 430 MW | 8.1 km |
| Elio Energy LLC | — | 13.7 km |