Oberon IB

Ector County, Texas · EIA plant ID 62932 · Operator: Oberon Solar IB
SolarSolar PhotovoltaicERCOTBA: ERCO
Nameplate30MWSummer 30 MW
Generators1in service
Net generation46GWh12 mo to Aug 2026
Capacity factor18%solar units, summer MW
Heat rate—thermal plants only
First online2020

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02468GWh202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2020202120222023202420252026202717.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202037.628.4%—
202163.124.0%—
202262.523.8%—
202365.124.8%—
20245420.5%—
202561.923.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
OBR1BSolar PhotovoltaicPV3030Jul 2020Operating—coming soon

Owner / operator

Operator: Oberon Solar IB. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
174 Power Global Corp.100.0%30 MW

Nearby plants

Within 80 km.
Oberon IA150 MW1.3 km
Swift Air Solar I145 MW8.5 km
Judkins BESS10 MW9.7 km
Non-PLD US-El Paso - BSSAT00410 MW16.7 km
Rockhound D28 MW17 km
Rockhound A245 MW17.2 km