Thanksgiving Fire Solar Farm, LLC
Johnston County, North Carolina · EIA plant ID 62786 · Operator: Sol Systems
Nameplate2MWSummer 2 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor20%solar units, summer MW
Heat rate—thermal plants only
First online2019
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2019 | 0.1 | 7.7% | — |
| 2020 | 3.7 | 21.2% | — |
| 2021 | 3.8 | 21.9% | — |
| 2022 | 3.9 | 22.1% | — |
| 2023 | 3.8 | 21.8% | — |
| 2024 | 3.6 | 20.7% | — |
| 2025 | 3.6 | 20.3% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 12087 | Solar Photovoltaic | PV | 2 | 2 | Dec 2019 | Operating | — | coming soon |
Owner / operator
Operator: Sol Systems. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Sol Systems | 100.0% | 2 MW |
Nearby plants
Within 80 km.
| Truman (NC) | 5 MW | 1.4 km |
| Wendell Solar Farm LLC | 5 MW | 4.5 km |
| 315 Vinson Road | 2 MW | 9.6 km |
| Red Toad 1425 A Powatan Road, LLC | 2 MW | 11.5 km |
| Powatan Road Solar | 2 MW | 11.7 km |
| Maple Leaf Solar | — | 11.8 km |