Pembina Land Port of Entry Wind TurbineRetired

Pembina County, North Dakota · EIA plant ID 62782 · Operator: General Services Administration - Region 8
WindMISOBA: MISO

×1 MW wind retired since 2020 (latest Jan 2022)

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0102030MWh2019202020212022

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%2%4%2019202020212022

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201900.0%—
20200.45.2%—
20210.34.6%—
20220——

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PEMWTOnshore Wind TurbineWT10.8Jun 2012Retired Jan 2022—nordic N1000-59

Owner / operator

Operator: General Services Administration - Region 8. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
American Crystal Sugar Drayton6 MW45.1 km
Grafton4 MW64.1 km