LafargeHolcim - Paulding Wind Project
Paulding County, Ohio · EIA plant ID 62752 · Operator: OEE XXVIII LLC
Nameplate5MWSummer 5 MW
Generators3in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online2020
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2019 | 0 | — | — |
| 2020 | 4.7 | 28.4% | — |
| 2021 | 11.3 | 28.7% | — |
| 2022 | 13 | 33.0% | — |
| 2023 | 11.2 | 28.4% | — |
| 2024 | 5.7 | 14.3% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| L1 | Onshore Wind Turbine | WT | 1.5 | 1.5 | Aug 2020 | Operating | — | goldwind GW 87/1500 |
| L2 | Onshore Wind Turbine | WT | 1.5 | 1.5 | Aug 2020 | Operating | — | goldwind GW 87/1500 |
| L3 | Onshore Wind Turbine | WT | 1.5 | 1.5 | Aug 2020 | Operating | — | goldwind GW 87/1500 |
Owner / operator
Operator: OEE XXVIII LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| OEE XXVIII LLC | 100.0% | 5 MW |
Nearby plants
Within 80 km.
| Mark Center Solar Project | 94 MW | 10.6 km |
| Timber Road IV | 125 MW | 14 km |
| Paulding Wind Farm III | 101 MW | 14 km |
| Timber Road Solar Park | 50 MW | 14.6 km |
| Auglaize Hydro | 4 MW | 18.5 km |
| Grover Hill Wind, LLC | 140 MW | 18.6 km |