Hellyer Solar Farm

Santa Clara County, California · EIA plant ID 62689 · Operator: County of Santa Clara (CA)
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate2MWSummer 2 MW
Generators1in service
Net generation0GWh12 mo to Dec 2025
Capacity factor1%solar units, summer MW
Heat rate—thermal plants only
First online2017

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400MWh2019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%201920202021202220232024202520261.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20193.718.9%—
20203.719.3%—
20214.623.8%—
20223.719.2%—
20233.618.8%—
202400.0%—
20250.21.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
HFARMSolar PhotovoltaicPV2.22.2Aug 2017Operating—coming soon

Owner / operator

Operator: County of Santa Clara (CA). Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
County of Santa Clara (CA)100.0%2 MW

Nearby plants

Within 80 km.
Guadalupe Solar Farm2 MW4.5 km
Yerba Buenaretired5.7 km
EQX010 Great Oaks Fuel Cell2 MW5.7 km
EQX015 Great Oaks Fuel Cell4 MW5.8 km
Equinix San Jose1 MW5.8 km
Equinix Great Oaks Blvd. Fuel Cell5 MW5.9 km