Northern Preserve Solar
Baker County, Florida · EIA plant ID 62645 · Operator: Florida Power & Light Co
Nameplate75MWSummer 75 MW
Generators1in service
Net generation122GWh12 mo to Aug 2026
Capacity factor19%solar units, summer MW
Heat rate—thermal plants only
First online2020
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2020 | 132.5 | 20.2% | — |
| 2021 | 130.1 | 19.9% | — |
| 2022 | 134 | 20.5% | — |
| 2023 | 126 | 19.3% | — |
| 2024 | 116.7 | 17.8% | — |
| 2025 | 119.1 | 18.3% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Solar Photovoltaic | PV | 74.5 | 74.5 | Jan 2020 | Operating | — | coming soon |
Owner / operator
Operator: Florida Power & Light Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Florida Power & Light Co | 100.0% | 75 MW |
Nearby plants
Within 80 km.
| Egret Solar Center | 75 MW | 5.7 km |
| Nature Trail | 75 MW | 6.9 km |
| Maple Trail | — | 8.5 km |
| Cedar Trail | 75 MW | 10.7 km |
| Trail Ridge Landfill Gas Recovery | 10 MW | 18 km |
| Jacksonville Solar | 13 MW | 27.2 km |