← Back to map

Achilles Solar

Montgomery County, North Carolina · EIA plant ID 62621 · Operator: strata manager, llc
SolarSolar PhotovoltaicBA: CPLE
Nameplate5MWSummer 5 MW
Generators1in service
Net generation10GWh12 mo to Dec 2025
Capacity factor22%solar units, summer MW
Heat rate—thermal plants only
First online2019

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.250.50.751GWh202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2019202020212022202320242025202622.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20199.423.8%—
20209.722.6%—
202110.123.5%—
202210.223.7%—
20239.722.6%—
20249.822.7%—
20259.622.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
ACHILSolar PhotovoltaicPV54.9Feb 2019Operating—coming soon

Owner / operator

Operator: strata manager, llc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Achilles Farm, LLC100.0%5 MW

Nearby plants

Within 80 km.
Hector Farm5 MW1.8 km
Haywood Farm Solar, LLC5 MW1.9 km
Uwharrie Mountain Renewable10 MW5.7 km
Copperfield2 MW7.6 km
Biscoe Solar LLC5 MW13.1 km
Montgomery Solar LLC20 MW13.1 km