← Back to map

CBP Solar

Westchester County, New York · EIA plant ID 62613 · Operator: EnterSolar
SolarSolar PhotovoltaicNYISOBA: NYIS
Nameplate2MWSummer 2 MW
Generators1in service
Net generation2GWh12 mo to Dec 2025
Capacity factor14%solar units, summer MW
Heat rate—thermal plants only
First online2018

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.250.50.751GWh2019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%20182019202020212022202320242025202613.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2018174.9%—
20192.213.6%—
20202.515.6%—
20212.314.8%—
20222.515.9%—
20232.314.7%—
20242.214.1%—
20252.213.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CBPB1Solar PhotovoltaicPV1.81.8Dec 2018Operating—coming soon

Owner / operator

Operator: EnterSolar. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Continental Building Products100.0%2 MW

Nearby plants

Within 80 km.
Indian Point 3retired0.7 km
Indian Point 2retired0.7 km
Wheelabrator Westchester60 MW1.3 km
NYP-Hudson Valley Hospital Center3 MW5.4 km
Croton Solar3 MW6.8 km
NY - Mines Press2 MW6.9 km