← Back to map

Tanglewood Circle Solar 1 LLC

Berkshire County, Massachusetts · EIA plant ID 62583 · Operator: Tanglewood Circle Solar 1 LLC
SolarSolar PhotovoltaicISONEBA: ISNE
Nameplate5MWSummer 5 MW
Generators1in service
Net generation7GWh12 mo to Dec 2025
Capacity factor16%solar units, summer MW
Heat rate—thermal plants only
First online2018

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600800MWh2019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%20182019202020212022202320242025202616.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20180.22.7%—
20197.116.2%—
20207.517.1%—
20216.915.7%—
20227.918.0%—
20237.316.7%—
20247.817.6%—
20257.216.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
5823Solar PhotovoltaicPV55Nov 2018Operating—coming soon

Owner / operator

Operator: Tanglewood Circle Solar 1 LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Tanglewood Circle Solar 1 LLC100.0%5 MW

Nearby plants

Within 80 km.
Town of Otis Wind Energy Project2 MW7.5 km
Lee Site 31 Solar2 MW10.9 km
Sunpin Blandford5 MW11.2 km
Woodland Roadretired13.9 km
Syncarpha Blandford Hybrid CSG9 MW14.7 km
Chester Solar Farm5 MW14.8 km