Nameplate2MWSummer 2 MW
Generators1in service
Net generation1GWh12 mo to Dec 2025
Capacity factor5%solar units, summer MW
Heat rate—thermal plants only
First online2018

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300MWh2019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2018201920202021202220232024202520265.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201800.2%—
20192.816.0%—
20203.218.3%—
20213.117.9%—
20223.218.3%—
20232.615.0%—
20242.816.2%—
20250.95.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PGR02Solar PhotovoltaicPV22Dec 2018Operating—coming soon

Owner / operator

Operator: SunStrong Management. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
SunStrong Management100.0%2 MW

Nearby plants

Within 80 km.
Fort Bragg - Camp Mackall PV BESS System3 MW13.1 km
Pinesage5 MW13.2 km
Pine Valley Solar Farm, LLC5 MW13.7 km
Sedberry Farm5 MW15.1 km
Gladstone Farm5 MW15.3 km
Foxfire Solar Farm5 MW15.4 km