← Back to map

Winchendon Landfill Solar

Worcester County, Massachusetts · EIA plant ID 62503 · Operator: Onyx Asset Services Group
SolarSolar PhotovoltaicISONEBA: ISNE
Nameplate2MWSummer 2 MW
Generators1in service
Net generation2GWh12 mo to Dec 2025
Capacity factor14%solar units, summer MW
Heat rate—thermal plants only
First online2018

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300400MWh2019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20182019202020212022202320242025202613.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20180.48.8%—
2019317.3%—
2020317.0%—
2021317.0%—
20223.319.0%—
2023316.9%—
20242.815.7%—
20252.413.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
10237Solar PhotovoltaicPV22Oct 2018Operating—coming soon

Owner / operator

Operator: Onyx Asset Services Group. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Solar Mission SunE LLC100.0%2 MW

Nearby plants

Within 80 km.
580 River Solar3 MW1.3 km
Winchendon Solar2 MW8.4 km
Royalston Solar One—8.5 km
Happy Hollow CSG Hybrid8 MW9.8 km
Gardner - Otter River Road3 MW10.4 km