Taygete Energy Project LLC
Pecos County, Texas · EIA plant ID 62483 · Operator: Taygete Energy Project LLC
Nameplate255MWSummer 255 MW
Generators1in service
Net generation501GWh12 mo to Aug 2026
Capacity factor22%solar units, summer MW
Heat rate—thermal plants only
First online2021
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2021 | 575.8 | 30.8% | — |
| 2022 | 585.9 | 26.2% | — |
| 2023 | 541.1 | 24.2% | — |
| 2024 | 452.5 | 20.2% | — |
| 2025 | 547.5 | 24.5% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| PV1 | Solar Photovoltaic | PV | 255 | 255 | Mar 2021 | Operating | — | coming soon |
Owner / operator
Operator: Taygete Energy Project LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| TE Taygete Energy HoldCo, LLC | 100.0% | 255 MW |
Nearby plants
Within 80 km.
| Taygete II Energy Project | 204 MW | 2.3 km |
| Coyanosa Gas | — | 12.3 km |
| Gomez | 10 MW | 17.3 km |
| Selenite Springs Solar | — | 20.3 km |
| TX7 Flat Top | 10 MW | 22.6 km |
| Flower Valley I | 10 MW | 22.7 km |