Grenada Lake Hydroelectric ProjectPlanned

Grenada County, Mississippi · EIA plant ID 62430 · Operator: Rye Development
HydroBA: TVA

10 MW planned (Conventional Hydroelectric), first expected Apr 2028 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
NA1Conventional HydroelectricHY54planned Apr 2028Planned—coming soon
NA2Conventional HydroelectricHY54planned May 2028Planned—coming soon

Owner / operator

Operator: Rye Development. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Enid Lake Hydroelectric Project—40.7 km
Delta's Edge Solar100 MW45.8 km
Wildwood Energy Storage—54.1 km
Wildwood Solar Plant100 MW54.1 km
SR Panola III, LLC4 MW58.4 km
SR Panola I, LLC5 MW58.5 km