West of the Pecos Solar
Reeves County, Texas · EIA plant ID 62415 · Operator: RWE Clean Energy
Nameplate100MWSummer 100 MW
Generators1in service
Net generation208GWh12 mo to Aug 2026
Capacity factor24%solar units, summer MW
Heat rate—thermal plants only
First online2019
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2019 | 5.8 | 7.8% | — |
| 2020 | 247.3 | 28.1% | — |
| 2021 | 252.2 | 28.8% | — |
| 2022 | 258.1 | 29.5% | — |
| 2023 | 230.4 | 26.3% | — |
| 2024 | 234.2 | 26.7% | — |
| 2025 | 244.8 | 27.9% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| WOTP1 | Solar Photovoltaic | PV | 100 | 100 | Dec 2019 | Operating | — | coming soon |
Owner / operator
Operator: RWE Clean Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| RWE Clean Energy | 100.0% | 100 MW |
Nearby plants
Within 80 km.
| Coyote Springs (TX) | 10 MW | 10.2 km |
| Sandlake | 10 MW | 13.7 km |
| Faulkner | 10 MW | 19.7 km |
| North Pecos Clean Energy Center (BESS) | 10 MW | 20.9 km |
| Elm Street BESS | 10 MW | 21.8 km |
| County Road BESS | 10 MW | 22.5 km |