Bell Bay Solar Farm

Horry County, South Carolina · EIA plant ID 62395 · Operator: Bell Bay Solar Farm
SolarSolar PhotovoltaicBA: SC
Nameplate2MWSummer 2 MW
Generators1in service
Net generation2GWh12 mo to Dec 2025
Capacity factor16%solar units, summer MW
Heat rate—thermal plants only
First online2018

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300MWh2019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%20182019202020212022202320242025202616.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20182.218.8%—
20192.618.6%—
20202.518.0%—
20212.618.5%—
20222.618.5%—
20232.518.0%—
20242.417.1%—
20252.316.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV1.61.6Mar 2018Operating—coming soon

Owner / operator

Operator: Bell Bay Solar Farm. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Bell Bay Solar Farm100.0%2 MW

Nearby plants

Within 80 km.
Runway Solar Farm2 MW0 km
Myrtle Beach112 MW4.6 km
Horry Land Fill Gas Site4 MW16.7 km
Landrace Holdings, LLC55 MW17.3 km
Georgetown LFGTE1 MW43.9 km
International Paper Georgetown Mill96 MW49.4 km