← Back to map

Shorthorn SolarPlanned

Lee County, South Carolina · EIA plant ID 62310 · Operator: Shorthorn Solar
SolarBA: CPLE

60 MW planned (Solar Photovoltaic), first expected Nov 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
74Solar PhotovoltaicPV6060planned Nov 2027Planned—coming soon

Owner / operator

Operator: Shorthorn Solar. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Bishopville Solar II, LLC10 MW7.8 km
Gary Solar2 MW7.9 km
Gaines Solar2 MW8.2 km
Bishopville Solar, LLC20 MW8.3 km
1634 Solar2 MW12.2 km
Lee County Landfill6 MW12.5 km