← Back to map

Francisco St. Solar

Los Angeles County, California · EIA plant ID 62287 · Operator: AES Distributed Energy
SolarSolar PhotovoltaicBA: LDWP
Nameplate1MWSummer 1 MW
Generators1in service
Net generation1GWh12 mo to Dec 2025
Capacity factor16%solar units, summer MW
Heat rate—thermal plants only
First online2018

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200MWh2019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20182019202020212022202320242025202615.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20180.18.3%—
20192.225.2%—
20202.326.4%—
20212.326.2%—
20222.326.1%—
20231.821.1%—
20241.213.7%—
20251.415.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
W7190Solar PhotovoltaicPV1.21Dec 2018Operating—coming soon

Owner / operator

Operator: AES Distributed Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
AES Distributed Energy100.0%1 MW

Nearby plants

Within 80 km.
Verizon-Torranceretired0.3 km
20333 Normandie PV, LLC3 MW0.5 km
VS BC Pacific Gateway, LLC1 MW1 km
Torrance Dis Ctr 2 - SLLAX100—1.1 km
Honda Torranceretired1.4 km
ExxonMobil Oil Torrance Refinery49 MW2.3 km