← Back to map

Durant

Cedar County, Iowa · EIA plant ID 6220 · Operator: City of Durant - (IA)
OilPetroleum LiquidsMISOBA: MISO
Nameplate4MWSummer 4 MW
Generators2in service
Net generation0GWh12 mo to Dec 2025
Capacity factor0%gas/coal/oil units, summer MW
Heat rate10,442Btu/kWhfossil units, electric fuel, HHV
First online1998Runs as rarely runs

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
010203040MWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%1%1%200520102015202020250.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
6,0008,00010,00012,0002005201020152020202510,442 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20010.51.1%9,970
20020.10.2%10,196
20030.30.7%9,687
20040.20.4%8,573
200500.1%8,774
20060.10.1%7,810
200700.1%—
200800.1%8,500
200900.1%9,724
201000.0%12,000
201100.0%9,067
201200.0%11,640
201300.1%11,495
201400.1%10,736
201500.0%—
201600.1%10,011
201700.0%—
201800.1%10,623
201900.0%10,350
202000.1%10,255
202100.1%9,857
202200.1%9,949
202300.1%10,516
202400.0%10,918
202500.1%10,442

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
7Petroleum LiquidsIC1.81.8Jan 1998Operating (Standby / backup)—coming soon
8Petroleum LiquidsIC2.62.6May 2011Operating (Standby / backup)—coming soon
4Petroleum LiquidsIC0.50.5—Retired Dec 2009—coming soon
5Petroleum LiquidsIC0.50.5—Retired Dec 2009—coming soon
6APetroleum LiquidsIC22.1Jul 1970Retired Feb 2018—coming soon

Owner / operator

Operator: City of Durant - (IA). Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
City of Durant - (IA)100.0%4 MW

Nearby plants

Within 80 km.
Wilton9 MW9 km
Eastern Iowa Solar2 MW10.3 km
AgriReNew1 MW10.9 km
Muscatine Plant #1276 MW26.1 km
Tipton9 MW26.5 km
Davenport Water Pollution Control Plant2 MW26.5 km