Big Fork SolarPlanned

Barnwell County, South Carolina · EIA plant ID 62184 · Operator: Big Fork Solar
BatteryBA: SCEG

150 MW planned (Batteries, Solar Photovoltaic), first expected Apr 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
26Solar PhotovoltaicPV74.974.9planned Nov 2028Planned—coming soon
27BatteriesBA74.974.9planned Apr 2027Planned—coming soon

Owner / operator

Operator: Big Fork Solar. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Haley Solar8 MW13.4 km
Barnwell Solar5 MW15.4 km
Allendale Biomass23 MW16.1 km
Quest Solar—17.7 km
Edison Solar5 MW18.3 km
Lily Solar70 MW18.8 km