Whispering Willow North

Franklin County, Iowa · EIA plant ID 62079 · Operator: Interstate Power and Light Co
WindOnshore Wind TurbineMISOBA: MISO
Nameplate201MWSummer 201 MW
Generators1in service
Net generation739GWh12 mo to Aug 2026
Capacity factor42%wind units, summer MW
Heat rate—thermal plants only
First online2020

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
020406080GWh2020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2020202120222023202420252026202741.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2020812.145.9%—
2021820.146.5%—
2022884.350.1%—
2023703.439.9%—
2024795.545.0%—
2025733.941.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Onshore Wind TurbineWT201.3201.3Jan 2020Operating—ge 2.5-127

Owner / operator

Operator: Interstate Power and Light Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Interstate Power and Light Co100.0%201 MW

Nearby plants

Within 80 km.
Alliant SBD 9502 Eatonretired16.7 km
Hampton Substation Energy Storage2 MW18.1 km
Franklin County Solar7 MW18.3 km
Franklin County Wind Farm99 MW19.9 km
Whispering Willow Wind Farm - East200 MW23.6 km
Century201 MW29.5 km