SolarSolar PhotovoltaicMISOBA: MISO
Nameplate5MWSummer 5 MW
Generators1in service
Net generation8GWh12 mo to Aug 2026
Capacity factor18%solar units, summer MW
Heat rate—thermal plants only
First online2019

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.250.50.751GWh2020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20192020202120222023202420252026202718.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20194.914.9%—
20208.218.7%—
20218.720.0%—
2022818.4%—
20237.717.5%—
20248.318.9%—
20257.717.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SCSolar PhotovoltaicPV55Apr 2019Operating—coming soon

Owner / operator

Operator: Nautilus Solar Solutions. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nautilus Solar Solutions100.0%5 MW

Nearby plants

Within 80 km.
FastSun 21 CSG1 MW0.4 km
Sherburne North Project CSG5 MW0.4 km
Hartmann Project CSG1 MW0.5 km
St. Cloud Solar CSG5 MW2 km
USS Haven Solar LLC CSG1 MW2.3 km
Haven Solar Project CSG3 MW2.5 km