Gavilan Community College Solar Project

Santa Clara County, California · EIA plant ID 61993 · Operator: Gavilan District College Solar Project
SolarBatteriesSolar PhotovoltaicCAISOBA: CISO
Nameplate2MWSummer 2 MW
Generators2in service
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online2018

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400MWh20192021

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%20182019202020212022

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20180.439.2%—
20194.441.9%—
20212.221.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GDCBABatteriesBA0.50.5Jun 2019Operating—coming soon
GDCPVSolar PhotovoltaicPV1.41.2Dec 2018Operating—coming soon

Owner / operator

Operator: Gavilan District College Solar Project. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Gavilan District College Solar Project73.7%1 MW
SolarStorage Fund C, LLC26.3%1 MW

Nearby plants

Within 80 km.
Gilroy Power Plant130 MW5.1 km
Gilroy Peaking Energy Center144 MW5.1 km
Graniterock Quarry4 MW14 km
Hollister Wastewater Facility1 MW20.9 km
Hollister Solar LLC2 MW21.5 km
Ameresco Santa Cruz Energy3 MW21.9 km