Prince Georges County, Maryland · EIA plant ID 61890 · Operator: NRG Chalk Point CT
OilPetroleum LiquidsPJMBA: PJM
Nameplate94MWSummer 80 MW
Generators1in service
Net generation21GWh12 mo to Aug 2026
Capacity factor3%gas/coal/oil units, summer MW
Heat rate13,781Btu/kWhfossil units, electric fuel, HHV
First online1990Runs as rarely runs

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-20246GWh20192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%1%2%3%201820202022202420263.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
10,00015,00020,00025,0002018202020222024202613,781 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20180.30.1%19,145
20190.90.1%20,686
202000.0%—
20210.90.1%18,413
20220.40.1%25,431
20230.30.0%—
20240.70.1%24,760
20257.11.0%15,174

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SGT1Petroleum LiquidsGT9480.2Jun 1990Operating—coming soon

Owner / operator

Operator: NRG Chalk Point CT. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
NRG Chalk Point CT100.0%94 MW

Nearby plants

Within 80 km.
Chalk Point LLC1,825 MW0 km
Herbert Farm Solar6 MW9.9 km
Rockfish Solar LLC10 MW17.2 km
Chesapeake Beach BESS1 MW17.9 km
CPV St Charles Energy Center775 MW18.1 km
Hall Property2 MW19 km