AES ES GILBERTOut of service

Maricopa County, Arizona · EIA plant ID 61861 · Operator: AES ES GILBERT, LLC
BatteryBatteriesBA: SRP
Nameplate10MWSummer 10 MW
Generators1in service
Net generation0GWh12 mo to Aug 2026
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online2019

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-250-200-150-100-500MWh20192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2019-1.6——
2020-2.2——
2021-2.2——
2022-0.7——
20230——
20240——
20250——

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SRPBatteriesBA1010Jan 2019Operating (Out of service)—coming soon

Owner / operator

Operator: AES ES GILBERT, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
AES ES GILBERT, LLC100.0%10 MW

Nearby plants

Within 80 km.
Crosscut3 MW1.3 km
Phoenix Airport East Economy Lot1 MW2.9 km
AZ State University - Tempe Campus Solar3 MW3.6 km
Arizona State University CHP17 MW4.2 km
Ocotillo806 MW4.9 km
Phoenix Airport Rental Car Center2 MW8.4 km