Jordanelle Dam Hydroelectric Project

Wasatch County, Utah · EIA plant ID 61853 · Operator: Central Utah Water Conservancy District
HydroConventional HydroelectricBA: PACE
Nameplate13MWSummer 13 MW
Generators2in service
Net generation49GWh12 mo to Dec 2025
Capacity factor43%hydro units, summer MW
Heat rate—thermal plants only
First online2008

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02468GWh201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2018202020222024202643.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201750.244.1%—
201847.641.8%—
201946.140.5%—
202049.243.1%—
202134.730.4%—
202231.127.4%—
20235044.0%—
20245144.6%—
202549.343.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN 1Conventional HydroelectricHY6.56.5Jul 2008Operating—coming soon
GEN 2Conventional HydroelectricHY6.56.5Jul 2008Operating—coming soon

Owner / operator

Operator: Central Utah Water Conservancy District. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Central Utah Water Conservancy District100.0%13 MW