Live Oak Wind Project
Schleicher County, Texas · EIA plant ID 61782 · Operator: Engie North America
Nameplate200MWSummer 200 MW
Generators1in service
Net generation828GWh12 mo to Aug 2026
Capacity factor47%wind units, summer MW
Heat rate—thermal plants only
First online2019
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2019 | 679.8 | 46.4% | — |
| 2020 | 817 | 46.6% | — |
| 2021 | 764.6 | 43.8% | — |
| 2022 | 774.9 | 44.3% | — |
| 2023 | 759.9 | 43.5% | — |
| 2024 | 746.7 | 42.6% | — |
| 2025 | 791.7 | 45.3% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| WTGS | Onshore Wind Turbine | WT | 199.5 | 199.5 | Mar 2019 | Operating | — | siemens SWT-2.625-120 |
Owner / operator
Operator: Engie North America. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Live Oak Wind Project, LLC | 100.0% | 200 MW |
Nearby plants
Within 80 km.
| Langford Wind Power | 150 MW | 6.7 km |
| Concho Valley Solar, LLC | 173 MW | 39.6 km |
| Pioneer Field Wind Power | — | 42.4 km |
| Santa Rita East | 302 MW | 49.7 km |
| Angelo Solar | 195 MW | 51.5 km |
| Angelo Storage | 100 MW | 51.9 km |