Berkshire County, Massachusetts · EIA plant ID 61769 · Operator: Syncarpha Hancock I, LLC
Nameplate2MWSummer 2 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor15%solar units, summer MW
Heat rate—thermal plants only
First online2017
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2017 | 0.1 | 2.3% | — |
| 2018 | 2.6 | 14.8% | — |
| 2019 | 3.1 | 17.4% | — |
| 2020 | 3.2 | 18.1% | — |
| 2021 | 3 | 17.4% | — |
| 2022 | 3.2 | 18.4% | — |
| 2023 | 2.9 | 16.4% | — |
| 2024 | 3.1 | 17.6% | — |
| 2025 | 2.7 | 15.5% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| SYNH1 | Solar Photovoltaic | PV | 2 | 2 | Nov 2017 | Operating | — | coming soon |
Owner / operator
Operator: Syncarpha Hancock I, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Syncarpha Hancock I, LLC | 100.0% | 2 MW |
Nearby plants
Within 80 km.
| Syncarpha Hancock III CSG | 1 MW | 0.6 km |
| Syncarpha Hancock II CSG | 2 MW | 1.1 km |
| Oak Leaf Solar XVII | 3 MW | 3.8 km |
| Oak Leaf Solar XVI | 1 MW | 3.8 km |
| Silver Lake Solar Photovoltaic Facility | 2 MW | 8.2 km |