← Back to map

Quincy II Solar Garden

Arapahoe County, Colorado · EIA plant ID 61752 · Operator: AEP Onsite Partners
SolarSolar PhotovoltaicBA: PSCO
Nameplate2MWSummer 2 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor27%solar units, summer MW
Heat rate—thermal plants only
First online2018

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300400MWh2019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20182019202020212022202320242025202627.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20182.326.5%—
20193.425.8%—
20203.425.8%—
20213.224.1%—
20223.224.1%—
20232.216.9%—
20243.324.9%—
20253.627.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PV1Solar PhotovoltaicPV1.51.5May 2018Operating—coming soon

Owner / operator

Operator: AEP Onsite Partners. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
AEP Onsite Partners100.0%2 MW

Nearby plants

Within 80 km.
Arapahoe 3 Community Solar Array2 MW1 km
DADS Gas Recovery3 MW4.8 km
Oak Leaf Solar XXI (CSG)2 MW5 km
USS Calico Solar LLC5 MW5.1 km
USS Raptor Solar LLC5 MW5.1 km
USS Hampden Solar LLC5 MW5.5 km