HEBT WLA 1

Orange County, California · EIA plant ID 61721 · Operator: Advanced Microgrid Solutions
BatteryBatteriesCAISOBA: CISO
Nameplate1MWSummer 1 MW
Generators1in service
Net generation-0GWh12 mo to Aug 2026
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online2019

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-60-40-200MWh2020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20190——
2020-0.2——
2021-0.1——
2022-0.2——
2023-0——
2024-0——
2025-0.1——

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
WLA01BatteriesBA11Aug 2019Operating—coming soon
WLA02BatteriesBA11planned Apr 2019not_current—coming soon
WLA03BatteriesBA11planned Apr 2019not_current—coming soon
WLA04BatteriesBA1.51.5planned Jul 2019not_current—coming soon
WLA05BatteriesBA1.31.3planned Jul 2019not_current—coming soon
WLA06BatteriesBA1.21.2planned Apr 2019not_current—coming soon
WLA07BatteriesBA11planned Jul 2019not_current—coming soon
WLA08BatteriesBA1.91.9planned Jul 2019not_current—coming soon
WLA09BatteriesBA4.54.5planned Aug 2019not_current—coming soon
WLA10BatteriesBA1.31.3planned Jul 2019not_current—coming soon
WLA1CBatteriesBA12.112.1planned Apr 2019not_current—coming soon

Owner / operator

Operator: Advanced Microgrid Solutions. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Sk Holdings Co. Ltd.50.0%1 MW
SUSI Partners AG50.0%1 MW

Nearby plants

Within 80 km.
Baker1 MW3.7 km
LAWRP1 MW7.1 km
Bowerman Power LFG, LLC24 MW7.5 km
HEBT Irvine 26 MW11.2 km
SOCCD1 MW12.1 km
Ortega Highway Energy Storage2 MW15.3 km