Depot Solar Center, LLC

Campbell County, Virginia · EIA plant ID 61691 · Operator: Emerald Hills Holding I, LLC
SolarSolar PhotovoltaicPJMBA: PJM
Nameplate15MWSummer 15 MW
Generators1in service
Net generation24GWh12 mo to Dec 2025
Capacity factor19%solar units, summer MW
Heat rate—thermal plants only
First online2022

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0246GWh202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2022202320242025202618.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20223146.8%—
20232922.1%—
202425.519.3%—
202524.418.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
DEPOTSolar PhotovoltaicPV1515Jul 2022Operating—coming soon

Owner / operator

Operator: Emerald Hills Holding I, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Emerald Hills Holding I, LLC100.0%15 MW

Nearby plants

Within 80 km.
Pigeon Run Solar Project—14.2 km
Gladys Solar LLC—14.9 km
Reusens13 MW21.7 km
Altavista Power Station71 MW22.4 km
Altavista Solar80 MW24.9 km
HCE Red House Solar, LLC5 MW28.7 km