Nameplate150MWSummer 150 MW
Generators1in service
Net generation670GWh12 mo to Aug 2026
Capacity factor51%wind units, summer MW
Heat rate—thermal plants only
First online2018
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2018 | 66.5 | 59.6% | — |
| 2019 | 661.8 | 50.4% | — |
| 2020 | 709.6 | 53.9% | — |
| 2021 | 657.3 | 50.0% | — |
| 2022 | 651.7 | 49.6% | — |
| 2023 | 660 | 50.2% | — |
| 2024 | 690.7 | 52.4% | — |
| 2025 | 651.9 | 49.6% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| WT | Onshore Wind Turbine | WT | 150 | 150 | Dec 2018 | Operating | — | ge 2.3-116 |
Owner / operator
Operator: Wildcat Ranch Wind Project, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Wildcat Ranch Wind Project, LLC | 100.0% | 150 MW |
Nearby plants
Within 80 km.
| Wildcat Ranch Energy Storage | — | 7.9 km |
| Sterling I Wind Farm | 30 MW | 32.8 km |
| Mule Shoe Energy Storage | — | 48.7 km |
| Sagamore Wind | 522 MW | 49.9 km |
| Milo Wind Project LLC | 50 MW | 54.6 km |