← Back to map

Arkwright Summit Wind Farm LLC

Chautauqua County, New York · EIA plant ID 61673 · Operator: Arkwright Summit Wind Farm LLC
WindOnshore Wind TurbineNYISOBA: NYIS
Nameplate78MWSummer 78 MW
Generators1in service
Net generation239GWh12 mo to Aug 2026
Capacity factor35%wind units, summer MW
Heat rate—thermal plants only
First online2018

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0102030GWh20192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2018202020222024202634.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201886.330.0%—
2019256.437.3%—
2020255.837.1%—
2021233.534.0%—
2022260.637.9%—
2023224.132.6%—
2024229.833.4%—
2025262.338.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
WTOnshore Wind TurbineWT78.478.4Aug 2018Operating—vestas V110-2.0

Owner / operator

Operator: Arkwright Summit Wind Farm LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Arkwright Summit Wind Farm LLC100.0%78 MW

Nearby plants

Within 80 km.
Rak 15 MW5 km
Rak 24 MW5.1 km
NY Fredonia 9824 Route 60 Solar5 MW5.2 km
Fredonia Solar LLC1 MW9.1 km
Cassadaga Wind Farm124 MW9.4 km
SL Dunkirk—9.9 km