Cougar Solar, LLC

Lee County, North Carolina · EIA plant ID 61658 · Operator: Cougar Solar, LLC
SolarSolar PhotovoltaicBA: CPLE
Nameplate2MWSummer 2 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor19%solar units, summer MW
Heat rate—thermal plants only
First online2017

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300400MWh20182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2018202020222024202619.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201700.0%—
2018423.9%—
20193.722.1%—
20203.621.3%—
20213.621.4%—
20223.722.0%—
20230.63.8%—
20243.319.7%—
20253.219.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
COUGRSolar PhotovoltaicPV1.91.9Dec 2017Operating—coming soon

Owner / operator

Operator: Cougar Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Cougar Solar, LLC100.0%2 MW

Nearby plants

Within 80 km.
Sweetgum Solar5 MW0.5 km
Balsam5 MW0.7 km
Elm Solar, LLC5 MW1.2 km
Boaz Farm Solar5 MW4.2 km
1025 Traveller Solar, LLC5 MW6.3 km
Cotten Farm, LLC5 MW7.5 km