Kilroy Solar

San Diego County, California · EIA plant ID 61628 · Operator: Nautilus Solar Solutions
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate1MWSummer 1 MW
Generators1in service
Net generation6GWh12 mo to Dec 2025
Capacity factor66%solar units, summer MW
Heat rate—thermal plants only
First online2018

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600800MWh20182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%20182019202020212022202320242025202665.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20181.919.4%—
20196.769.7%—
20206.870.1%—
20216.971.9%—
20227.174.1%—
20236.770.0%—
20246.264.0%—
20256.365.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
KILROSolar PhotovoltaicPV1.11.1Jan 2018Operating—coming soon

Owner / operator

Operator: Nautilus Solar Solutions. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nautilus Solar Solutions100.0%1 MW

Nearby plants

Within 80 km.
Q Plantretired4.7 km
Canyon Crest Academy1 MW4.7 km
W Plant5 MW5.1 km
P Plantretired5.7 km
UCSD Fuel Cell Plantretired6.6 km
University of California San Diego Hybrid33 MW6.8 km