CF Novel Solar CSG Gardens Seven, LLC

Sherburne County, Minnesota · EIA plant ID 61548 · Operator: Solar Star Arizona II LLC
SolarSolar PhotovoltaicMISOBA: MISO
Nameplate3MWSummer 3 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor15%solar units, summer MW
Heat rate—thermal plants only
First online2017

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600MWh20182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2018202020222024202615.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201700.0%—
20181.96.6%—
2019413.7%—
20205.217.9%—
2021517.2%—
20224.415.3%—
20235.318.2%—
20244.916.8%—
20254.415.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Solar PhotovoltaicPV3.33.3Dec 2017Operating—coming soon

Owner / operator

Operator: Solar Star Arizona II LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Solar Star Arizona II LLC100.0%3 MW

Nearby plants

Within 80 km.
Pickerel Garden1 MW0.2 km
SolarClub 15 LLC1 MW0.3 km
Sherco Solar III250 MW1.1 km
MN CSG 2019-671 MW1.4 km
Tiller CSG5 MW1.5 km
Hammer CSG5 MW1.8 km